What's New

A simple summary of what has been added or changed for shop-floor users.

October 2026

Finished parts now counted from the start/end signal

  • A part counts as finished when the machine's start/end signal (#800) goes from 1 back to 0, whatever programme is running.
  • Part-count emails are only used where that signal isn't available, such as older history.
  • The part number now comes from the programme name, e.g. O1038 shows as 001-WB-00-1038 ISSUE L.
  • Production, the machine tiles, Throughput, Parts, the monitoring widget and the assistant all use the same count.

August 2026

Monitoring screen widget

  • New full-screen widget page at /widget showing one compact tile per machine.
  • Each tile shows: status colour, part number, programme, 1-day and 7-day efficiency, parts made today, time in current state, and any active alarm.
  • Tapping a tile now opens a detail view for that machine with a 3-day efficiency heatmap, recent alarms and recent completed parts.
  • A public JSON feed is available so other monitoring apps can render the same tiles.

Comment on Efficiency heatmap blocks

  • You can now tap or click an hour block on the Efficiency heatmap to add a comment.
  • Drag across several blocks (or tap start then end on touch screens) to annotate a whole range, e.g. "Tue 25 Aug 09:00–13:00".
  • Choose your name, a reason category (Tooling, Setup/changeover, Breakdown, No material/pallets, No operator, Planned maintenance, Quality issue, Other) and type a note.
  • Annotated blocks get a small corner marker; hover or tap to read the comment.
  • A list below the heatmap shows every comment in the selected date range for quick weekly reviews.

More accurate cycle times from the #800 macro signal

  • The machines can now send a precise "part start / part end" signal via macro variable #800.
  • When this signal is available, cycle times are calculated from the true start and end of each part instead of guessing from part-count jumps.
  • Cycles that came from the macro signal show a small precision badge; older part-count cycles stay visible until the macro is active for that programme.
  • This improves the Production charts, ETA calculator, Batch Planner and efficiency figures automatically.

Parts page replaces Cycle Times

  • The old "Cycle Times" page is now a simpler "Parts" reference list.
  • Each row shows a part, the machine it runs on, and the programmes used for Op1, Op2, etc.
  • It also shows how many recorded runs exist and when the part was last seen, so you can judge how reliable the data is.
  • Filters: machine tabs and a quick search box.

Production is now the main live page

  • The Dashboard has been cleared and / now opens /production by default.
  • Everything that was on the Dashboard (fleet summary strip, machine tiles, overdue warnings, utilisation strips) now lives at the top of the Production page.
  • The Dashboard is kept for future KPIs and is reachable from the top menu.

Faster loading on the shop-floor PC

  • The app now loads less JavaScript up front: the AI chat and on-screen keyboard only load when you actually use them.
  • Pages fetch fewer database rows and only the columns they need.
  • Refresh polling pauses when the screensaver is running or the browser tab is hidden, then resumes automatically.
  • Chart data is cached and downsampled for long date ranges.

Kiosk mode and screensaver

  • A "Kiosk" button in the header expands the page to fill the screen and hides browser chrome.
  • After a set idle time a screensaver appears showing the MTI logo; a further idle period blanks the screen to save the monitor.
  • Touching the screen wakes it back up.

On-screen keyboard and number pad

  • Text boxes open a full on-screen keyboard; number boxes open a large number pad for touch use.
  • A keyboard icon in the header lets you turn these off when a physical keyboard is connected.

Batch Planner

  • New Batch Planner page under "More" for estimating when a batch of parts will finish.
  • Enter batch size, start time and staffing pattern (Day, Night, Weekend).
  • The planner generates an ideal schedule and lets you edit it manually.
  • Replenishment is scheduled before pallets run empty.

Configurable efficiency colour bands

  • The colours used for efficiency percentages are now configurable under Configuration.
  • Default bands: MTI Gold 95–100%, Green 75–95%, Amber 50–75%, Red below 50%.

Machine switcher

  • The Alarms, Status and Notes pages now have a machine switcher, just like Efficiency, so you can move between machines without going back to the menu.

Fullscreen mode

  • A maximise button is available on the Production page and the whole app can be set to fullscreen via the header.

M01 alarms ignored

  • M01 optional-stop alarms are now treated as noise and no longer trigger alarm warnings.

Overdue part warning

  • Production machine cards show a red warning when a part has not completed within 25% of its typical cycle time, together with how overdue it is.

ETA to target calculator

  • Each Production machine card has an "ETA to target" calculator.
  • Enter how many more parts you need and the cycle time basis (in HH:MM); it estimates the finish time.

AI Production Assistant

  • A floating chat assistant can answer questions about current machine status and predict completion times.
  • It only loads when opened, so it does not slow down the main pages.

Navigation changes

  • Top menu now gives quick access to Production, Dashboard and Efficiency.
  • Less-used pages (Cycles/Parts, Batch Planner, Roadmap, Scheduling, Configuration) are grouped under a "More" dropdown.
  • A hard-refresh button is at the top left for recompiling the site.
  • The current time and date are shown in the header.